Project and responsibility record
Complete the project identification and professional-responsibility record before issuing the technical memorandum.
Project input required
Issue the Project Information Form to obtain the project information, site records and responsible-party data required for the technical memorandum.
OPERATOR / 01 Circus operator record
ENGINEER / 02 Engineer of Record
Circus Images (Optional)
Add one primary image for identification and up to six captioned detail images for the dedicated photographic-record page in the technical report. Without uploads, the standard report layout is retained.
IMAGE / 03 Primary circus image
Inserted on the cover and in the report identification section.
Technical-report size: 170 × 80 mm (full page width).
Accepted formats: JPG, PNG, WEBP. Maximum file size: 5 MB.
IMAGE / 04 Detail images (up to 6)
Inserted on the dedicated photographic-record page in the technical report.
Technical-report size: 85 × 60 mm each (2×3 grid, up to six images).
Accepted formats: JPG, PNG, WEBP. Maximum: 5 MB per image.
Circus Installation Site
Search the installation address to obtain coordinates, position the canopy on the map and select the nearest European wind context automatically.
SITE / 05 Installation address
SITE / 06 City and site reference
Installation Position on Map
Mark the canopy location. The scaled layout is inserted into the technical report as a location figure.
Circus Classification and Location
Select the circus configuration and installation context. The calculator applies initial planning values that remain editable for the specific project.
CONFIG / 07 Capacity and audience
WIND / 08 Site and wind input (EN 13782 / EN 1991-1-4)
Automatic wind-value traceability (optional)
Circus Technical Parameters
Initial parameters are populated from the selected circus configuration. Adjust them for the specific project condition.
SEATING / 09 Grandstand
⛺ Canopy and Wind
Accepted local file format
{"qp":0.82,"ze":10,"source":"Wind study","reference":"WS-014","nationalAnnex":"UK NA","date":"2026-08-11"}. CSV/TXT also accepts qp;0.82, ze;10, source;…, reference;… and nationalAnnex;…. The Engineer of Record confirms that the imported record is applicable to the site.⚓ Masts and Cables
SUPPORT / 10 Lattice column and foundations
No calculation has been run yet
Complete the previous tabs and run the preliminary verification. Utilization ratios, element results, standards checks and the technical report are shown here.